Performance characteristics
Dust-proof and moisture-proof, anti-skid and anti-corrosion, wear-resistant and pressure-resistant, acid and alkali-resistant, flexible, fire-proof and energy-saving, small occupied space, anti-electromagnetic interference, moisture-proof, easy cutting and splicing, durable and other characteristics;
construction technology
1, grass-roots treatment: use the grinding machine to remove the surface sand, oil pollution and residue.
2. Laying the floor: from the central position, the floor is spread out one by one, and the gap between each floor is 2-3 mm.
3, floor slotting: U diameter 2.0-2.5 mm;
4. Floor welding rod: adopt special 3.5-4.0 mmPVC electrode.
5. Floor welding: 800-1000W torch is used to weld along the gap between floors, and the electrode should be shoveled to the same level as the surface plate.
6. Floor waxing: the surface must be cleaned and polished and waxed.
7. Completion of construction: 12 hours later, it can be used normally (25 C, low temperature opening time needs to be prolonged moderately)
Technical indicators
Features |
test method |
Company |
detection result |
Specific gravity |
Astm d792 |
|
1.45 |
Sturdiness |
Astm d2240(shore1) |
|
|
Dimensional stability |
|
|
Less than 0.1 |
Vibration test |
Ksm3802 |
|
normal |